Model Tech Yak 54 Bedienungsanleitung Seite 50

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 80
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 49
50
20. Iron the bottom covering to securely seal the
covering to the bottom of the rear canister tun-
nel former.
21. Dry fit the header and canister inside the tun-
nel and ensure there is clearance on all sides.
Canister Installation
1. Determine the location of the rear canister
mounting hanger. This should be approxi-
mately two thirds back on the canister or as
described in the canister installation instruc-
tions and as desired by the builder. Mark this
location on the edge of the canister tunnel.
2. Transfer this mark to the top of the canister
tunnel. Ensure the mounting holes in the top
of the canister tunnel will not interfere with
any equipment installed or to be installed in-
side the fuse.
Seitenansicht 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 79 80

Kommentare zu diesen Handbüchern

Keine Kommentare